Avalon Yard Construction Report. April 2024
Avalon Yard
до 1 May 2024
We share news from the Avalon Yard construction site. Our team is moving at a frantic pace, brick by brick approaching the result. your home
Currently, construction is underway in phases 3-7, and phases 1-2 are fully completed.
7.1, 7.2 - foundation in work;
7.3 poured foundation, the monolith of the 1st floor is in the works.
monolithic works are ongoing, in parallel work is being carried out on the masonry of the external walls.
readiness of the monolith 90%;
phase 5.1 - monolithic works are completed;
work on the masonry of the external walls is ongoing.
decorating walls with clinker, painting walls;
installation of elevators on line 3 - completed;
elevator installation process - 4th stage;
installation of inspection doors in a niche with VC, ETR networks in the MZK;
a fence has been installed;
finished tiling;
gables were installed above the apartment doors;
completed facade of 2-8 floors;
80% of the tiles on the balconies are completed;
mounted air conditioner baskets on 3.1, 3.2;
mounted smoke removal system on the roof;
work is ongoing on the arrangement of flower beds, decoration of the facade and patio.