Avalon Yard Construction Report. October 2024
Avalon Yard Construction Report. October 2024
AVALON TERRA CONSTRUCTION REPORT. NOVEMBER 2024
Avalon Terra
до 11 November 2024
Avalon Terra is growing every day, bringing closer the moment when you will cross the threshold of your own home.
While the team is tirelessly creating every detail of this space, we suggest you take a look at how November passed at the construction site.
Section 1 - foundation pouring and monolithic works of the 1st and 2nd level parking lot have been completed.
Sections 2 and 3 - work on arranging the foundation slab is ongoing.
Section 4 - installation of the first floor slab above the parking lot has been completed.
Sections 5 and 6 - the slab above the parking lot has been installed, work on arranging the slabs above the storage rooms has been completed.
Avalon Terra on Pasichna. A place in the middle of nature, where it is cozy and calm. Where you want to return. Because this is the feeling of a real home. Where you can enjoy the silence and truly relax. It is about synergy with nature. About people and for people. An important challenge was to create a sense of space for a person. To put their comfort and coziness at the heart of the idea. To emphasize this with interesting, concise forms, to set rhythm. We pay a lot of attention to details, because they decide everything. Our concept involved a lot of work with the placement of windows and balconies, finding harmony between colors and reproducing them in the smallest details. Rounded shapes, softening the house, emphasizing its features with warm, natural tones. Details worked out to the smallest detail.